Along with providing equipment to solve customer’s complex VOC, NOx, and Odor pollution challenges, we also provide installation services. I was on site for the recent “lift” of a new QUADRANT SR-35,000 Thermal Oxidizer (TO).
Along with providing equipment to solve customer’s complex VOC, NOx, and Odor pollution challenges, we also provide installation services. I was on site for the recent “lift” of a new QUADRANT SR-35,000 Thermal Oxidizer (TO).
Topics: Air Pollution Control, Regenerative Thermal Oxidizer, Thermal Oxidizer, Catalytic Oxidizer, Blog, Installation
Posted by Jan Carlson
Jul 6, 2017 9:40:08 AM
Catalytic Products International Provides Regenerative Thermal Oxidizer (RTO) to Flexographics Printer
Catalytic Products International (CPI) recently completed the installation of a new TRITON Series Regenerative Thermal Oxidizer (RTO) at Formel Industries in Franklin Park, IL for the abatement of Volatile Organic Compounds (VOCs).
Topics: Regenerative Thermal Oxidizer, News, Flexographic Printing, Blog, Installation, Dryer
Posted by Jan Carlson
Jun 19, 2017 9:26:27 AM
At Catalytic Products International (CPI), each project we work with is different. Regardless of the differences, we use our experience and expertise to work with all our end users and their engineering / construction / environmental partners to ensure they are addressing their air pollution control needs as efficiently and cost-effectively as possible. We want to share those stories through our blog to help you see how CPI can provide the best air pollution control solutions for your situation.
Topics: Regenerative Thermal Oxidizer, Customer Testimonials, Pharmaceutical & Medical, Blog, Installation
Posted by Jan Carlson
Jun 8, 2017 1:19:36 PM
Catalytic Products International Provides Regenerative Thermal Oxidizer (RTO) to Pharmaceutical Company
Catalytic Products International (CPI) recently completed the installation of a new TRITON Series Regenerative Thermal Oxidizer (RTO) to a USA based pharmaceutical company for the abatement of Volatile Organic Compounds (VOCs) from the Fluid Bed Dryer, Film Coater, and Tray Dryer process lines.
Topics: Regenerative Thermal Oxidizer, News, Pharmaceutical & Medical, Blog, Installation, Dryer
Posted by Jan Carlson
Dec 8, 2016 1:25:27 PM
At Catalytic Products International, we are proud of the great work that our team does to implement air pollution control solutions for our clients. To highlight the different areas of expertise that these team members bring to these solutions, we’ve been speaking to these experts and sharing their insights here on our blog.
Topics: Air Pollution Control, Expert Interviews, Blog, Installation
At Catalytic Products International, we work with our clients every day to help them ensure that they are addressing their air pollution control needs as efficiently and cost-effectively as possible. With our years of experience and level of expertise, we can help them address their concerns and find the best solutions to meet their needs. Each client we work with is different, and we want to share their stories to show how CPI can provide the best air pollution control solutions for any industry.
Topics: Regenerative Thermal Oxidizer, Customer Testimonials, Flexographic Printing, Blog, Installation, Rebates
At Catalytic Products International, we work with a wide variety of clients to help them meet their air pollution control needs. While each client is different, our experience and expertise ensures that we are able to help them address and resolve the issues they experience. In this series of customer testimonial blogs, we’ll be sharing some of these success stories.
Topics: Thermal Oxidizer, Customer Testimonials, Blog, Ceramic & Carbon Fiber Composites, Heat Exchanger, Installation
Posted by Jan Carlson
May 2, 2016 3:43:15 PM
One question which we frequently receive is about the length of the process of building and installing an oxidizer. There are many factors which influence the oxidizer installation process, including the client’s procurement process and the complexity of the equipment and location of the site. In this series of blogs, we’ve been taking a look at a typical industrial process utilizing a standard thermal oxidizer, catalytic oxidizer, or regenerative thermal oxidizer. We’ve previously discussed the timelines for the client buying process and oxidizer delivery and installation. In this final blog, we’ll look at the timeline for compliance testing.
Topics: Air Pollution Control, VOC Emissions, Regenerative Thermal Oxidizer, Thermal Oxidizer, Blog, Installation, DRE Test
Posted by Jan Carlson
Apr 15, 2016 5:07:17 PM
At CPI, we are frequently asked about the length of time necessary to build and install an oxidizer. The answer to that question is complicated, depending on a variety of factors such as the client’s procurement process and the complexity of the equipment and location of the site. To help build understanding of the decisions that go into this process, we wanted to take a closer look at a typical industrial process utilizing a standard thermal oxidizer, catalytic oxidizer, or regenerative thermal oxidizer. In our first blog on this topic, we looked at the client buying process. Today, we’ll look at the timeline for oxidizer deliver and installation.
Topics: Air Pollution Control, VOC Emissions, Regenerative Thermal Oxidizer, Thermal Oxidizer, Blog, Installation
Posted by Jan Carlson
Mar 4, 2014 5:19:00 AM
Today many companies are faced with unique air pollution control problems arising from their part coating operations. Not only are vented emissions required to be controlled, but now a more pressing issue is how to treat fugitive emissions.
Topics: Automotive Industry, Catalytic Oxidizer, Paint & Coatings, Case Studies, Fastener Coating, Installation
CONTACT US
SITE SEARCH
A PROUD MEMBER OF

Catalytic Products International
Phone: 847.438.0334
Copyright 2026 Catalytic Products International